1

Find a straight length of your gas or oil pipe (15cm required) leading into the boiler housing.

Step one of fitting the Boostaboiler ™ unit
2

The Boostaboiler ™ unit is then placed on to that pipe as close as possible to the boiler.

Step two of fitting the Boostaboiler ™ unit
3

Slip nylon ties (provided) around the Boostaboiler ™ and pipe, pull until secured in place. Snip off loose ends.

Step three of fitting the Boostaboiler ™ unit